<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=137780345909624&amp;ev=PageView&amp;noscript=1">

Mount Ephraim Glamping

Lucy Dawes approached Glampitect after looking for ways to diversify her family estate and gardens. After kicking off with a Feasibility study, Lucy received expert information to help her along to launch an exciting, dog friendly glamping experience in Faversham, Kent. 

Having just launched on New Years Eve 2023, explore Mount Ephraim Glamping.

  • Feasibility Study
  • Full Planning Light
  • Pod Build Advice
Read Full Case Study

Braeview Glamping

After working with Morag Sallabanks on a Feasibility study, we helped her to obtain planning permission for her adult-only Glamping site on the Berwickshire coast.

We assisted Morag with pod design and build to ensure she had the best possible pods for her future visitors whilst ensuring maximum ROI.

By having a clear vision for the Braeview Glamping site, the owners have created a highly successful business which was profitable almost immediately.

  • Feasibility Study
  • Full Planning Application
  • Pod Build Assistance
Read Full Case Study

Chid Glamping

We met Lord Edmund Limerick at the Glamping Show and helped him to create a brand new glamping site in the grounds of the glorious Chiddinglye estate.

We advised Lord Limerick on the best way to provide accommodation for visitors to the microbrewery and wedding venue on the estate and worked with him to find the most suitable glamping pods and put everything in place for a successful business. We also assisted Lord Limerick with his pod design and build to ensure he had the perfect units. Furthermore, we created a highly profitable and user friendly website and booking system for Chid Glamping.

  • Choosing Glamping Pods
  • Obtaining planning permission
  • Identifying the target market
  • Pod Build Assistance
  • Website & Booking System
Read Full Case Study

North Coast 500 Pods

We have completed the full range of work for North Coast 500 Pods from glamping planning permission to project management. See a list of completed works for NC500Pods:

  • Pre-Planning Application
  • Full Planning Applicaiton
  • Website Design & Channel Manager Setup
  •  Build Project Management
  • Digital Marketing
  • Social Media Management

Essentially we did  the full package for them. This has lead to hem having 75% occupancy in their first year with year 2 looking even busier!

Read Full Case Study

Cairnfold Cabins

Cairnfold Cabins came to us after being recommended by one of our affiliated manufacturers – Lune Valley Pods.

They had already almost completed their build and needed some online assistance.

We created a fantastic website with automated booking system so they can take bookings whilst they sleep and are available to book on:

Lane’s End Pods

We completed a Pre-Planning application for Lane’s End Pods in Slapton. This will likely progress to a Full Planning application as time progresses.

We first met the owners at the Glamping Show 2019 and managed to advise them on their potential site before we went ahead and started work on their site.

Being in an AONB (Area of Outstanding Natural Beauty) we had to be very mindful of the design to ensure it complied with all relevant regulations.

This ongoing project is hopeful of opening in early 2021 following on from the design and build work.

Again pods will be provided by Lune Valley Pods, this time a combination of their Mega Pods and Apartment Pods.

Aberlour Pods

Another site we agreed to work with following on from our help and advice to them at the Glamping Show 2019. Quite a long way from Lane’s End Pods however, which are in the South of England!

This application comprises 2 separate sites a few hundred meters apart.

We have some basic pods with a barbecue area on one site and 2 apartment pods on the other.

This Full Planning application is taking place as we speak and is another site we target an early 2021 open for!

North Coast 500 Pods 2

After the outstanding success of the first year of North Coast 500 Pods first site, they decided a second site.

This new project is again on the North Coast 500, where NC500 Pods aim to have a site every 100 miles within 5 years.

Currently at planning stage, we completed the Pre-Planning application and plan to have the Full Planning Application submitted soon.

With a targeted opening of Spring 2020, this is a very fast moving project that we are loving being involved with!

We will complete all the works for the design as well as the online launch for NC500 Pods 2 to ensure they have a very fast start when opening!

Contact Us

Got Questions?